Srinagar: Traffic over the strategic Srinagar-Jammu highway has been put to halt due to repair of steel tunnel at Panthyal area of the road.
Officials told INS that due to ongoing repair work traffic has been halted and will be thrown open once cleared by the NHAI.
“The SSG road is through for vehicular movement, however Mughal road is still blocked,” he said.