The INS News
No Result
View All Result
  • Home
  • News
    • Regional
    • Srinagar
    • Jammu
    • National
    • World
  • Business & Economy
  • Multimedia
    • Photo Gallery
    • Video Gallery
  • Health
  • Jobs & Careers
  • Press Releases
  • Blog
  • Home
  • News
    • Regional
    • Srinagar
    • Jammu
    • National
    • World
  • Business & Economy
  • Multimedia
    • Photo Gallery
    • Video Gallery
  • Health
  • Jobs & Careers
  • Press Releases
  • Blog
No Result
View All Result
The INS News
No Result
View All Result
Home News Regional

AC approves roll out of Rooftop Solar Scheme in Jammu and Kashmir

JAKEDA to install 200 MW Grid Tied Rooftop Solar Power Plants on 50,000 residential buildings in Jammu city

INS Desk by INS Desk
June 11, 2022
A A
AC Re-Designates All Posts Under PM Package As Divisional Level Posts In Kashmir  
Share on FacebookShare on TwitterWhatsappTelegramEmail

SRINAGAR, JUNE 11: The Administrative Council (AC), which met here under the chairmanship of Lieutenant Governor, Manoj Sinha, approved the installation of 200 MW of grid-tied rooftop solar power plants under the “Solar City Mission” in Jammu.

RELATED POSTS

Make PM’s Katra visit memorable: LG to poeple

PM Modi to Inaugurate Kashmir Rail Link on June 6, to Flag Off Vande Bharat at Katra

5 injured in Sinthantop accident

Rajeev Rai Bhatnagar, Advisor to the Lieutenant Governor, Dr. Arun Kumar Mehta, Chief Secretary, J&K and Nitishwar Kumar, Principal Secretary to the Lieutenant Governor attended the meeting.

The decision has been taken to implement the Government of India’s Grid-connected Rooftop Solar Scheme, Phase-II for the residential sector in Jammu and Kashmir to ensure that the electricity needs of the city are fully met from solar energy.

Under the project, 200 MW grid-tied rooftop solar power plants will be installed on 50,000 residential buildings in Jammu city by the Jammu and Kashmir Energy Development Agency (JAKEDA) under its “Solar City Mission” at an estimated cost of Rs 1040 crore. The project will be completed by March, 2024 and will have a lifetime of 25 years.

The Rooftop Solar Programme will provide subsidized installation of solar power panels on residential houses at the cost of Rs. 58,739, Rs. 53,995, Rs. 52,594, and Rs. 51,309 for Category-A (Up to 1 kW), Category-B (> 1 kW to 2 kW), Category-C (> 2kW up to 3 kW), and Category-D (> 3 kW up to 10 kW), respectively.

The Central Sector Scheme provides a central subsidy component of 40% of the project cost and a state subsidy component of 25% of the project cost for the installation of solar power panels, below 3 kW capacity, beyond which the central subsidy component remains at 20%. The subsidy will be provided to the beneficiaries through the DBT mode.

These rooftop solar power plants will be connected to the grid on a net metering basis. The investments made by the beneficiaries will be recovered at a rate of 25% annually on account of the saving of energy, with a payback period of approximately 4 years.

Buy JNews
ADVERTISEMENT

With the implementation of the project, J&K will benefit from the generation of approximately 280 million units of energy annually, with a corresponding reduction in carbon emissions of approximately 5.44 million tons, besides reaping gains from savings on account of inter-state transmission losses to the tune of 224 million units.

The generation of solar energy through the Rooftop Solar Programme will also help the energy-deficit UT of J&K in supplementing its energy needs, while assisting the DISCOMs in achieving the Renewable Purchase Obligation (RPO) Targets of 10.5% as fixed by the Government of India.

The project will also provide employment opportunities to local youth. Based on employment estimates, it is calculated that the 1 MW rooftop solar PV project generates a total of 40 full-time equivalent (FTE) jobs over the 25 years expected lifetime of the project, which includes highly skilled personnel for business development, design, sales, procurement, and project management; one-time jobs for construction and installation of the rooftop PV system; and unskilled resources required annually for cleaning activity of the plant.

A number of additional job roles are also created by solar PV grid-connected projects in secondary and tertiary roles vis-à-vis manufacturing and supply of system equipment such as inverters, cables, trackers, and other parts. As such, around 8000 jobs will be generated through the project.

The scheme mandates implementing agency, viz. JAKEDA to provide regular quality supervision and certification of the quality of material to be installed; periodic monitoring of physical progress and third-party quality checks from MNRE approved test centres; provide free maintenance for a period of 5 years post installation; install bi-directional net-meters; and ensure project completion within the given timelines.

Previous Post

Kashmir University hosts mega Sufi Mushairah, poets from across country perform at glittering event

Next Post

AC approves adoption of Schedule of Rates for Engineering Departments

INS Desk

INS Desk

Related Posts

Make PM’s Katra visit memorable: LG to poeple
Regional

Make PM’s Katra visit memorable: LG to poeple

June 4, 2025
J&K has immense opportunity in tourism sector: PM Modi
Regional

PM Modi to Inaugurate Kashmir Rail Link on June 6, to Flag Off Vande Bharat at Katra

June 3, 2025
3 persons killed in Kishtwar accident
Regional

5 injured in Sinthantop accident

June 3, 2025
‘Mela Kheer Bhawani’ centuries-old embodiment of India’s civilisational heritage: Chugh
Regional

‘Mela Kheer Bhawani’ centuries-old embodiment of India’s civilisational heritage: Chugh

June 3, 2025
J&K incomplete without KPs: Mehbooba Mufti at Kheer Bhawani temple
Regional

J&K incomplete without KPs: Mehbooba Mufti at Kheer Bhawani temple

June 3, 2025
Govt terminates 4 more employees over narcotics trade in J&K
Regional

3 Govt employees sacked over terror links in J&K

June 3, 2025
Next Post
AC Re-Designates All Posts Under PM Package As Divisional Level Posts In Kashmir  

AC approves adoption of Schedule of Rates for Engineering Departments

3 IAS officers attached to H&ME for assisting in Coronavirus mitigation efforts in J&K

J&K reports 12 new covid-19 cases, no death

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *




Aug 1, 1990: When 12 civilians including 2 cops fall prey to bullets

Baramulla medical shop owner dies of covid-19, J&K toll 118

July 3, 2020
CM Omar Visits GMC Jammu, Assures Support to Injured Amid Ongoing Tensions

CM Omar Visits GMC Jammu, Assures Support to Injured Amid Ongoing Tensions

May 9, 2025
3 IAS officers attached to H&ME for assisting in Coronavirus mitigation efforts in J&K

36 Travelers Among 428 New Covid-19 Cases, 7 Deaths Reported In J&K

June 22, 2021

About

Indian News Service (INS) is the first registered online news portal from the state of Jammu & Kashmir. Our creative team consists of like-minded and socially concerned team of media professionals who carry decades of experience in their field of profession at their back. Our core values have pillars in honesty, empathy, credibility, equality and integrity.

More

© 2022 INS News - Designed by GITS.

No Result
View All Result
  • Home
  • News
    • Regional
    • Srinagar
    • Jammu
    • National
    • World
  • Business & Economy
  • Multimedia
    • Photo Gallery
    • Video Gallery
  • Health
  • Jobs & Careers
  • Press Releases
  • Blog

© 2022 INS News - Designed by GITS.